Three Core Program Benefits

Zero-Hassle Logistics
Don't waste billable labor hours managing or hauling old units. The Lennox AES team handles all site scheduling, loading, and transport directly from your job site or yard at zero cost to your business.

Upfront Cashback Quotes
Stop leaving revenue on the job site. Receive transparent cashback estimates for rooftop units, chillers, and commercial refrigeration racks based on estimated tonnage before a truck is ever dispatched.

100% EPA-Compliant Recycling
Protect your business from regulatory risk. Every unit undergoes certified refrigerant recovery and recycling at an AES facility, keeping over 99.9% of waste out of landfills.
How It Works (4 Simple Steps)

Step 1: Submit Details online
Enter your equipment make/model, estimated tonnage, and location in under 60 seconds.

Step 2: Get an Estimated Quote
A Lennox AES team member will reach out with an upfront expected earnings quote based on your equipment's estimated weight—no pre-inspection or site visit required.

Step 3: No Hassle Pickup
Lennox AES coordinates and handles the heavy lifting directly from your job site or shop yard.

Step 4: Precision Weighing & Payout
Once units are processed at the Lennox AES facility, final cash back is determined and your payout is issued alongside official compliance reports

Winning Commercial Bids? Hand Your Clients Proof.
Every pickup through End-Of-Life Equipment Cash Back includes three official documentation reports you can hand directly to building owners and enterprise clients:
-
EPA Section 608 Recovery Report (With technician license verification)
-
Landfill Avoidance Report (Verifying 99.9% diversion rate)
-
Carbon Footprint Reduction Estimate
Ready to clear out your yard and get paid?
Submit your project details now to receive your upfront cashback quote.
Request for Pick-up
For Collections: The awarded HVAC installing contractor is responsible for the removal and replacement of all rooftop equipment illustrated on the project documents and coordinating the pick-up of the existing equipment with Lennox AES Recycling.
Coordination of the pick-up includes providing Lennox AES Recycling with every equipment model number to be picked up 2 weeks prior to the pick-up date. The existing equipment shall be loaded at the job site or an agreed location onto the trailers provided by Lennox AES Recycling within two hours of the scheduled pick-up time. The awarded installing contractor is responsible for all labor and equipment required to load the equipment onto the AES trailers. Loading time for trailers/flatbeds must not exceed four (4) hours. The installing contractor will be responsible for charges if loading times exceed four (4) hours or if number of trailers exceeds the estimate due to incorrect information being provided at the time of quoting.
For ALL projects: The awarded installing contractor is responsible for ensuring all units have all loose accessories removed and/or secured, such as economizers, access doors, and outdoor air hoods. Further, the installing contractor will not load any unit, equipment, or component onto a transport vehicle if such unit, equipment, or component exhibits, or is reasonably suspected of, leaking oil, lubricant, or any other fluid that could pose a hazard or cause damage during transportation.
Contractor will comply with the applicable provisions of EPA Clean Air Act, Title VI, Section 608 and Code of Federal Regulation Title 40, Part 82, and Clean Water Act Section 311, when removing air conditioning or refrigerated equipment units. Contractor will document all removed rooftop equipment units recording their identification numbers, model and serial numbers, the amount of refrigerant recovered from each unit, the date of decommissioning, including the company name and signature of an on-site supervisor. The awarded installing contractor shall continue to provide for all other documentation for new rooftop equipment units installed in accordance with the specifications and required project close-out documents.


